Sound is fitted, I have removed the moulding lines from around the top sides of the boiler, added a crew, some Severn Mill plates, replaced the tank lifting mounts and rings with some Warren Sheppard items (and some 4mm brass rings) added fire irons and a bucket (held on by a crew made hook) and also added lamps.
Only things left to do now is paint and glue the Warren Sheppard tank filler caps and get her weathered.



