Re: Baseboard access and removal
Posted: Sat Mar 22, 2025 7:41 pm
When I started mine I built the framework first and on top of that I fitted all the baseboard sections all jointed together with bolts and dowels. After the track was laid I laid on the lower shelf I fitted, to do all the wiring and soldering, but I did go through a number of tee shirts when doing the soldering upside down as well as having a bad back.