Cast Iron Bridge tops

A place to show what you are building, altering, kit bashing etc.
Post Reply
User avatar
Mr Bones
Posts: 695
Joined: Sun Oct 14, 2018 9:24 pm
Location: Canterbury Area
Contact:

Cast Iron Bridge tops

#1

Post by Mr Bones »

I'm thinking of adding a bridge similar to or maybe even this one Cast Iron Bridge
My question regards how the top of a bridge like this would look. Would it be rails laid on sleepers with normal ballast or planking? Or would the rails be inlaid into the planking? or would it maybe of been girders?
Any advice welcome.
And the Lord said unto John “Come forth and receive eternal life”, but John came fifth and won a toaster!
User avatar
bulleidboy
Posts: 2403
Joined: Thu Oct 04, 2018 6:30 pm
Location: Basingstoke, Hants
Contact:

Re: Cast Iron Bridge tops

#2

Post by bulleidboy »

Hi Tony - does this help??

Image51090290507 by Barry Clayton, on Flickr
User avatar
Walkingthedog
Posts: 5059
Joined: Thu Oct 04, 2018 5:51 pm
Location: HAZLEMERE, BUCKS.
Contact:

Re: Cast Iron Bridge tops

#3

Post by Walkingthedog »

I laid mine without ballast. My thoughts were on a bridge the track isn’t going to move and doesn’t need drainage.
Image
Nurse, the screens!
User avatar
Brian
Posts: 2275
Joined: Thu Oct 04, 2018 3:49 pm
Location: SE Kent
Contact:

Re: Cast Iron Bridge tops

#4

Post by Brian »

Its quite usual for BR tracks on metal bridges to be laid on Longitudinal Wheel Timbers, which are long and very wide and deep bulks of timber running along underneath each rail. The Wheel Timbers are often held apart by cross timbers or metal ties and the rails are held in place on top of the wheel timbers by the metal rail chairs.
For simplicity WTD has the right idea of just laying the sleepered track onto the deck of the model bridge. It can be laid loose (Not ideal IMO) or lightly glued to the bridge decking to retain the track. Ballast is rarely (if ever?) used on metal bridges in the UK. But there is quite probably a metal bridge somewhere that is ballasted?

Image Image curtesy of Network Rail
Image << Click the Icon to go to my website
User avatar
Walkingthedog
Posts: 5059
Joined: Thu Oct 04, 2018 5:51 pm
Location: HAZLEMERE, BUCKS.
Contact:

Re: Cast Iron Bridge tops

#5

Post by Walkingthedog »

I did intend to cut the sleeper away between the rails but never got round to it.
Nurse, the screens!
User avatar
Mr Bones
Posts: 695
Joined: Sun Oct 14, 2018 9:24 pm
Location: Canterbury Area
Contact:

Re: Cast Iron Bridge tops

#6

Post by Mr Bones »

Thank you everyone that does really help. I suspected it wouldn't be ballast, but couldn't find suitable photos. I think planking will be the way ahead, probably using cut down coffee stirrers.

Which bridge is that WD or is it scratch built? I love the rivet detail - No I won't be counting them :D

Most I've seen don't have that level of detail.
And the Lord said unto John “Come forth and receive eternal life”, but John came fifth and won a toaster!
User avatar
Walkingthedog
Posts: 5059
Joined: Thu Oct 04, 2018 5:51 pm
Location: HAZLEMERE, BUCKS.
Contact:

Re: Cast Iron Bridge tops

#7

Post by Walkingthedog »

It’s a KS Laser O gauge bridge. They do an OO version.

https://kslaserdesigns.com/OO-scale/OO- ... -bowstring
Nurse, the screens!
Conmaira
Posts: 29
Joined: Mon Jan 17, 2022 9:27 am
Contact:

Re: Cast Iron Bridge tops

#8

Post by Conmaira »

Brian wrote: Thu Dec 30, 2021 2:44 pm Its quite usual for BR tracks on metal bridges to be laid on Longitudinal Wheel Timbers, which are long and very wide and deep bulks of timber running along underneath each rail. The Wheel Timbers are often held apart by cross timbers or metal ties and the rails are held in place on top of the wheel timbers by the metal rail chairs.
For simplicity WTD has the right idea of just laying the sleepered track onto the deck of the model bridge. It can be laid loose (Not ideal IMO) or lightly glued to the bridge decking to retain the track. Ballast is rarely (if ever?) used on metal bridges in the UK. But there is quite probably a metal bridge somewhere that is ballasted?

Image Image curtesy of Network Rail
According to a US model railway site, plate girder bridges are often ballasted but that could be just US practice?

I also have a vague memory of LT overhead line bridges being ballasted but could be totally wrong. Their bridges tend to be a lot shorter so it may have appeared to be ballasted but in reality wasn't!
Post Reply

Who is online

Users browsing this forum: No registered users and 4 guests