That’s it, Shaddeholme has left the building.
This weekend I found out just what a cr@ppy job I did when I built the baseboards - all sorts of odd offcuts making dismantling a bit of a challenge. I have saved the harbour and the main station but I had to take a sabresaw to the engine yard.
The next job, before I start on the new layout, is to build a new support frame for Low Ghyll to keep it straight and level. I intend to build this from plywood I beams with similar cross bracing that actually matches up with the shelf supports. The frame will be a permanent structure while the modular baseboards will ‘float’ on top. It will also serve as a trial run as I intend to use the same method on the new layout, just a bit bigger and hopefully stronger.
2021-03-07_02-04-10 by
Steve Mumford, on Flickr